Procurement and Contracting Requirements

Subject: Marketing Channel Management

Paper Model: APA

Paper Type: Assignment

Total Words: 568

Document Outline

General Requirements

Division 02 –Existing Conditions

Division 03 – Concrete

Division 05 – Metals


Document Preview

Construction of office

Division 00 – Procurement and Contracting Requirements

Designing office project that have space of four people and one boss andremaining includes subordinates.  The activities for construction recognized as teamwork.

Division 01 – General Requirements

 The volume capacity about 9688 cubic feet, perimeters of 118.4 associated with the four outer walls, thickness of wall 4.5 inches both sides for the construction of office building. The total area of office is consolidates about 938.8 square feet and clearance area is restricted about to 265.41. These are main requirements for the construction of an office.

Division 02 –Existing Conditions

 The existing conditions requirements are area of plot is 1114.5.All three sides of office clearanceareaccording to the requirements.

Division 03 – Concrete

The concrete slab of size is about 1000 slabs with the size of 1.18 square feet.  The surface of area is consolidated about 1184 square feet.

Division 04 – Masonry

 The cost of masonry is $ 5.00 which means that 0.05 cost per slab of masonry.

Division 05 – Metals

Unbreakable and durable development of building recognized under the usage of metals.

Division 06 – Wood, Plastic and Composites

The decoration of doors and roof associated with the wood. Composites and plastics are used for the building windows and furniture.

Division 07 –Thermal and Moisture Protection

The coating of wooden protects the layers on wall to keep rooms cooler in the season of summer.

Click the button above to view the complete essay, speech, term paper, or research paper

Tags


Related Uploads

pages
.
pages
.
.
6 pages

Construction Project

Subject: Internet Marketing

Model: APA

Type: Assignment

Words: 568

27 pages
.
.
14 pages
pages
.

Driving Value through Procurement

Subject: Consumer Behavior

Model: APA

Type: Assignment

Words: 3071

.
pages
11 pages

Change Management

Subject: Business-to-Business Marketing

Model: APA

Type: Assignment

Words: 2699

4 pages

Construction

Subject: Consumer Behavior

Model: APA

Type: Assignment

Words: 455

7 pages
.

Importance of Solicitation and methods

Subject: Economics

Model: APA

Type: Assignment

Words: 1486

.
pages
.
.
13 pages
pages
.
.
4 pages
.

Iowa Elevators

Subject: Marketing Channel Management

Model: APA

Type: Coursework

Words: 615

.
17 pages
.
.
10 pages
5 pages
14 pages
.
pages
.
8 pages
.
.

Recent Documents